8th and 9th floor construction is complete! Welcome Bioengineering!

Print This Post Print This Post
IMG_0978

The college is pleased to announce that renovations on the 8th and 9th floors of the engineering
building are complete. Faculty and staff for the new Department of Bioengineering have been moving
into the space over that last week. Furthermore, faculty and students are busily preparing the new
innovative lab spaces. With the 8th and 9th floors now complete and operational, the college has gained
more than 20,000 square feet of lab and administrative space.